<?xml version="1.0" encoding="UTF-8" ?><rss version="2.0"><channel><title>ABB: PP/PTPH/News article/Global/English</title><link>http://www.abb.com.my:80/feeds/news/PP/PTPH/News%20article/Global/us/Organizational/abb.rss</link><description></description><language>en</language><copyright>Copyright 2010 ABB</copyright><lastBuildDate>Tue, 7 Sep 2010 13:03:39 GMT</lastBuildDate><image><title>ABB: </title><link>http://www.abb.com.my:80/</link><url>http://www.abb.com/Client/Images/Logo.gif</url></image><item>	<pubDate>Tue, 7 Sep 2010 13:03:39 GMT</pubDate>	<title>Higher substation availability and lower environmental impact</title>	<description>2010-09-07 - Field experience over the last decade has proved ABB made Disconnecting Circuit Breakers (DCBs) to be a revolutionary concept for improving substation availability and reliability while significantly lowering environmental impact and substation footprint. The DCB design is based on conventional live tank circuit breakers and fulfils the function of one circuit breaker and two disconnectors. </description>	<link>http://www.abb.com.my:80/cawp/seitp202/191a2930b0a48777c1257796002a2940.aspx</link>	<guid>http://www.abb.com.my:80/cawp/seitp202/191a2930b0a48777c1257796002a2940.aspx</guid></item><item>	<pubDate>Mon, 6 Sep 2010 10:05:25 GMT</pubDate>	<title>ABB boosts efficiency in Bangladesh &apos;s national power grid</title>	<description>2010-09-06 - An ABB solution has improved the efficiency, reliability and quality of power supplies in the Bangladesh power grid, improving its power factor by 11 percent and enabling an additional 34 megawatts of electricity to reach customers - all with a payback time of 18 months.</description>	<link>http://www.abb.com.my:80/cawp/seitp202/01dedc2864fb0efcc125779600376cc7.aspx</link>	<guid>http://www.abb.com.my:80/cawp/seitp202/01dedc2864fb0efcc125779600376cc7.aspx</guid></item><item>	<pubDate>Tue, 31 Aug 2010 13:33:51 GMT</pubDate>	<title>ABB’s PASS module for barge mounted gas power plant in India</title>	<description>2010-08-31 - As the switchyard is built on reclaimed land space saving was a crucial element in substation design</description>	<link>http://www.abb.com.my:80/cawp/seitp202/aab2262a522aeca5c1257790002ca8be.aspx</link>	<guid>http://www.abb.com.my:80/cawp/seitp202/aab2262a522aeca5c1257790002ca8be.aspx</guid></item><item>	<pubDate>Fri, 20 Aug 2010 12:53:07 GMT</pubDate>	<title>ABB showcases new power technologies at CIGRE event in Paris</title>	<description>2010-08-20 - Focus on energy efficiency, grid reliability and the evolution of smarter, more flexible grids </description>	<link>http://www.abb.com.my:80/cawp/seitp202/f5c865051133c3f7c12577850046c7b9.aspx</link>	<guid>http://www.abb.com.my:80/cawp/seitp202/f5c865051133c3f7c12577850046c7b9.aspx</guid></item><item>	<pubDate>Fri, 6 Aug 2010 15:11:11 GMT</pubDate>	<title>Breakthrough for Disconnecting Circuit Breakers (DCB) in Australia</title>	<description>2010-08-06 -  ABB recently won its first order for Disconnecting Circuit Breakers (DCBs) in Australia for the Juna Down substation project from the international mining group Rio Tinto. Key elements for Rio Tinto in choosing the DCB technology were its reduced footprint due to space restrictions imposed by the terrain around the yard and the reduction in maintenance requirements. </description>	<link>http://www.abb.com.my:80/cawp/seitp202/0b94d28615503c88c125777700500900.aspx</link>	<guid>http://www.abb.com.my:80/cawp/seitp202/0b94d28615503c88c125777700500900.aspx</guid></item><item>	<pubDate>Fri, 30 Jul 2010 14:51:26 GMT</pubDate>	<title>ABB solves power quality problem for Accenture</title>	<description>2010-07-30 - An ABB solution has solved power quality problems that caused nuisance tripping and server downtime at two Accenture office complexes in India. Not only did the solution solve the problem, it reduced the energy consumption of critical devices by 20 percent.</description>	<link>http://www.abb.com.my:80/cawp/seitp202/e58ac1f44ae998f3c125777000519cd6.aspx</link>	<guid>http://www.abb.com.my:80/cawp/seitp202/e58ac1f44ae998f3c125777000519cd6.aspx</guid></item><item>	<pubDate>Thu, 15 Jul 2010 11:28:31 GMT</pubDate>	<title>ABB substation at Fujairah to strengthen UAE transmission network</title>	<description>2010-07-15 - A new substation from ABB will serve the electricity needs of developments planned at Sudah port and the Al Hayl industrial areas of Fujairah, one of seven emirates that make up the United Arab Emirates. </description>	<link>http://www.abb.com.my:80/cawp/seitp202/0c71b0173f3f6659c1257761003f0929.aspx</link>	<guid>http://www.abb.com.my:80/cawp/seitp202/0c71b0173f3f6659c1257761003f0929.aspx</guid></item><item>	<pubDate>Thu, 15 Jul 2010 11:25:35 GMT</pubDate>	<title>ABB wins $34 million power equipment order in Italy</title>	<description>2010-07-15 - High-voltage gas-insulated switchgear to facilitate Italy-France power interconnection </description>	<link>http://www.abb.com.my:80/cawp/seitp202/9fa7c0b40bb556fbc1257761003ec45b.aspx</link>	<guid>http://www.abb.com.my:80/cawp/seitp202/9fa7c0b40bb556fbc1257761003ec45b.aspx</guid></item><item>	<pubDate>Tue, 13 Jul 2010 12:27:54 GMT</pubDate>	<title>A powerful solution in half the space for Mumbai</title>	<description>2010-07-13 - A hybrid switchgear technology pioneered by ABB has enabled Tata Power to increase the capacity and improve the reliability of 10 substations in the Indian megacity of Mumbai.</description>	<link>http://www.abb.com.my:80/cawp/seitp202/6bba8ddd9aa62f98c125775f00447720.aspx</link>	<guid>http://www.abb.com.my:80/cawp/seitp202/6bba8ddd9aa62f98c125775f00447720.aspx</guid></item><item>	<pubDate>Tue, 13 Jul 2010 06:43:13 GMT</pubDate>	<title>ABB&apos;s high voltage hybrid switchgear for reliable power in Sofia city centre</title>	<description>2010-07-13 - The compact substation, powering the European Trade Centre, business offices and the shop areas in the proximity fits in the space equivalent to parking slots for two lorries.</description>	<link>http://www.abb.com.my:80/cawp/seitp202/b1e64a9fb107a6eec125775f002307da.aspx</link>	<guid>http://www.abb.com.my:80/cawp/seitp202/b1e64a9fb107a6eec125775f002307da.aspx</guid></item></channel></rss>